Technical monitoring for the N08 & N09 office and laboratory building on the Campus Krems

Energy Efficiency & Operational Optimization Energieverbrauchsmonitoring EN Technisches Monitoring EN Untersuchung der GLT-Einstellungen EN

The N08 & N09 office and laboratory building became fully operational in 2024. It features a comprehensive building services system, including two heat pumps with a ground-source heat exchanger array, as well as district heating to cover peak loads. The aim is to reduce district heating consumption and, consequently, to maintain an energy system that is as sustainable as possible and easy to operate.

Project description

The N08 & N09 office and laboratory building comprises four sections and was constructed on the Campus Krems in two phases, having been fully operational since 2024. The building complex covers a net floor area of approximately 23,710 m² and consists of several structures, each with two basement levels and up to four upper storeys. Heating and cooling are provided by two heat pumps with a ground-source heat pump field, supplemented by district heating to cover peak loads.

The ventilation system comprises several innovative ventilation units, which are connected via an integrated circuit system for heat recovery. Heat and cooling are distributed via structural activation, underfloor heating and cooling, ceiling cooling and fan coils.

The aim of the project is to use a combination of technical monitoring (TMon) and detailed energy consumption analyses (EM) to assess the performance of the building services systems, identify potential for optimisation and, in particular, reduce district heating consumption as well as system wear and tear and, consequently, operating costs.

Technical monitoring & energy consumption analysis
Operational optimisation is based on a quarterly review of the system’s operation under real-world conditions. Seasonal factors (e.g. the heating season, summer operation) are taken into account. Using our ISO 50001-certified monitoring software, control logic is digitally modelled and compared with real-time data from the building management system. This facilitates the identification of malfunctions, inefficient operating conditions and technical faults at an early stage.

 


Paul Lampersberger, e7

 

 

Frequently Asked Questions (FAQ)

Which key challenge does this project address?

The Campus Krems is currently experiencing difficulties with the operation of its heat pumps during the winter period. The ground-source heat pump system is currently not delivering the required output, which means that district heating has to be used more extensively during the winter months.

What are the objectives of the project?

The aim of the project is to assess the performance of the building services systems by combining technical monitoring with detailed energy consumption analyses, to identify opportunities for optimisation and, in particular, to reduce district heating consumption as well as wear and tear on the systems and, consequently, operating costs.

What services are provided by e7 for this project?

e7 is responsible for the technical monitoring of four test cycles, each involving different load conditions. The review of the building services' operation is documented, presented to the operating staff and the contractors, and recommendations are made regarding the next steps.

Which project milestones have been completed to date?

The initial workshop in a series of four, as planned, has already been conducted.

What key findings have been identified so far, and what significance do they have for future projects?

According to the operating staff and the contractor, the geothermal probe system is not behaving as expected. The system will therefore be examined more closely and, if necessary, analysed in detail as part of a supplementary research project in collaboration with an Austrian research institution.

 